PROJECT EXPERIENCE (Latest first)
_______________________________________________________________________________________________
NOV 2014 – (CURRENT), transitioned from ENGDRAW DESIGN SERVICES
CROSBIE DESIGN SERVICES – PERTH (WA)
Set up and managed this Design Drafting business. Predominantly working for Boral on their Orange Grove quarry upgrade.
Models and / or detailed drawings for the following projects.
ROY HILL Ultrafine Iron Ore project. Filter feed tanks and Hoppers design.
KIPOI Agglomerater Surge Bin design.
NORTHERN MINERALS Ore sorter project layout and details
FMR GREENFIELDS MILL Primary Crusher Replacement project. And Screen replacement project.
ALBEMARLE LITHIUM PROJECT Limestone grinding and storage stairway assemblies
BORAL Pug mill feed hopper and feeder. Fuel farm design / layout. Numerous chute designs to improve flow. Wash screen. Water discharge monitor station. Numerous other works.
_______________________________________________________________________________________________
MAY 2015 – JULY 2019____________________________________________________
GR ENGINEERING SERVICES LTD – PERTH (WA)
Assigned responsibility for various plant layouts for studies both in 3D models and 2D layouts.
Assigned responsibility to check mechanical drawings for Nova Nickel Project, Ok Tedi and various other projects.
Developed as built buried services drawings for the Gold Road project, Dalgaranga Gold Project and Ok Tedi Project.
_______________________________________________________________________________________________
NOV 2014 – NOV 2019_transitioned to CROSBIE DESIGN SERVICES
ENGDRAW DESIGN SERVICES – PERTH (WA)
Set up and managed my own Design Drafting business. Predominantly working for Boral on their Orange Grove quarry upgrade. Also contracting to Brightwater Engineering in New Zealand on a variety of work from Earthquake strengthening detailed drawings to Maintainance platforms for Air New Zealand.
_______________________________________________________________________________________________
NOV 2014 – 2016____________________________________________________
SOLID FUELS COMBUSTION TECHNOLOGIES (SFCT) – PERTH (WA)
FLETCHER INTERNATIONAL – ALBANY – BIOMASS BOILERHOUSE DESIGN AND LAYOUT
Principal Designer responsible for setting out the overall site GA along with the Mechanical, Civil and Structural design drafting details.
Setup CAD standards. Develop templates and customize AutoCAD, Inventor and Navisworks to suit operational requirements. Due to limited volume of work I am now covering SFCT needs at weekends as required.
_______________________________________________________________________________________________
FEB 2013 – FEB 2015 ___________________________________________
BRIGHTWATER ENGINEERING SOLUTIONS – PERTH (WA)
BARRO POINT WILSON QUARRY PROJECT
Assigned the Principal Design Draftsman position to manage the overall site GA along with the Mechanical, Civil and Structural design drafting details. Actively assisting and when required being responsible for the resolution and solutions to Mechanical, Structural and Civil issues as they arise.
Assist in developing and setting up the overall design drafting mythology, procedures and processes for this project. Responsible for the implementation and management of the software, hardware and drafting staff as required. Setting up templates and libraries, and problem solving all CAD related issues.
Assemble, maintain and update a full, site wide, 3D Navisworks model to check interfaces and to provide other checking staff and site crews with a clear understanding of what was being manufactured in China and installed in Australia. Also in parallel with this was the developing and maintaining of a 2D set of AutoCAD drawings detailing the full extent of the Structural, Civil and Mechanical components and layout.
_______________________________________________________________________________________________
JAN 2013______________________________________________________________
LANGKILDE ENGINEERING SERVICES – PERTH (WA)
GENERAL DESIGN DRAFTING DUTIES
Provide working drawings for walkways and hand railing for Dampier Salt project as required.
_______________________________________________________________________________________________
NOV 2012 – DEC 2012 ______________________________________________
ARCCON MINING SERVICES - PERTH (WA)
MOUNT WINDARRA NICKEL MINE
Provide 3D visual images and overview of proposed site redevelopment. Develop and assemble 3D AutoCAD components for the site model. Develop and manage Navisworks BIM model. Produce fly around overview movie (.mp4) of the proposed complex.
_______________________________________________________________________________________________
MAY 2012 – NOV 2012______________________________________________
ARCCON MINING SERVICES - PERTH (WA)
DUGALD RIVER PROJECT – CRUSHING AND GRINDING AREA
Responsible for the design and drawings of various conveyors, chutes and components as required for the project. Responsible for the setup and maintenance of the site Navisworks BIM model up to 70% review. Providing full rendered conceptual images of the site and plant. Provide general assistance with AutoCAD (2D and 3D) and Navisworks queries and setup when required.
_______________________________________________________________________________________________
2011 – APRIL 2012___________________________________________________
BRIGHTWATER ENGINEERING – NELSON (NZ)
BULLER COAL ESCARPMENT PROJECT
Lead Design Draftsman on this contract. Responsible for General arrangement and site layout drawings and detail. Responsible for the Drawings and design layouts on the feasibility study of the various Coal transportation options. Involved in researching and investigating placement of Gondola and Ropecon options along with Rail loop, Haul roads, Electrical and water services. Developed and updated 3D models of various options for consent issues.
_______________________________________________________________________________________________
2010 - 2011____________________________________________________________
BRIGHTWATER ENGINEERING – NELSON (NZ)
BARRO GROUP MELBOURNE AUSTRALIA
General aggregate conveyor design drawings. Responsible for design of 5 conveyor assemblies and the overall site Navisworks 3D model.
_______________________________________________________________________________________________
2008-2010_____________________________________________________________
BRIGHTWATER ENGINEERING – NELSON (NZ)
SOLID ENERGY – STOCKTON MINE CHPP PROJECT
Lead Design Draftsman on this contract. Responsible for developing the General arrangement drawings of the site. Including the detail positioning of all Mechanical Equipment, Civil work, Drainage and all services and amenities. Cross checking the various disciplines. Developed updated and maintained the overall site 3D Navisworks visualisation model.
This was a 125 million dollar contract and the biggest engineering contract within NZ at that time.
_______________________________________________________________________________________________________
2007-2008_____________________________________________________________
BRIGHTWATER ENGINEERING – NELSON (NZ)
PIKE RIVER COAL DEVELOPMENT
Responsible for the General Site arrangement including layout drawings.
Design and drawings of the Pit Bottom Sizing Station, Thickener and CHPP building components.
_______________________________________________________________________________________________
2006__________________________________________________________________
MILLERS MECHANICAL – DUNEDIN (NZ)
WESTGATE COLD STORES LTD
MELBOURNE AUSTRALIA
Carton conveyor upgrade. On site survey. Responsible for General arrangement and layout drawings as well as specific component drawings required.
COLUMBIA RIVER USA
Refrigerated carton tunnel system.
General arrangement and layout drawings as well as specific design drawings for components required.
_______________________________________________________________________________________________
2005_________________________________________________________________
MILLERS MECHANICAL – DUNEDIN (NZ)
ALLIANCE GROUP MATAURA
BEEF HOUSE UPGRADE STAGE 2
General arrangement and specific conveyor drawings and designs
BROADLAMB LAMB PROCESSING
GREENFIELD PLANT YORK WA
Site wide general arrangement drawings.
ABBEX INTERNATIONAL LTD
Design and layout of upgrade to Chiller rail system
MINNESOTA BEEF INDUSTRIES
BUFFALO LAKE USA
General Site arrangement and specific conveyor design drawings.
_______________________________________________________________________________________________
2004-2006_________________________________________________________
MILLERS MECHANICAL – DUNEDIN (NZ)
AFFCO IMLAY – WANGANUI PLANT
SLAUGHTER FLOOR AND CHILLER REPOSITION AND UPGRADE.
Multi staged project over 3 years.
Numerous on site surveys. Responsible for General arrangement and layout drawings as well as specific design drawings for components required.
_______________________________________________________________________________________________
2004_______________________________________________________________
MILLERS MECHANICAL – DUNEDIN (NZ)
AUSTRALIAN MEAT HOLDINGS
NEW PLATE FREZZER
Installation and specific conveyor design.
CMP RANGITIKEI
SLAUGHTER FLOOR REDEVELOPMENT
General arrangement and specific conveyor design.
SOUTH PACIFIC MEATS
SLAUGHTER FLOOR UPGRADE
Responsible for General arrangement and layout drawings.
INGHAMS ENTERPRISES Pty. Ltd.
WAITOA – CARTON CONVEYOR SYSTEM UPGRADE
On site survey. Responsible for General arrangement and layout drawings as well as specific Pneumatic roller conveyor component drawings as required.
RICHMOND PACIFIC
WHAKATU - HASTINGS
On site survey. Change to conveyor layout and develop drawings for components required.
_______________________________________________________________________________________________
2003___________________________________________________________
MILLERS MECHANICAL – DUNEDIN (NZ)
TEYS BROTHERS
INNISFAIL NORTH QUEENSLAND AUSTRALIA
NEW PLATE FREZZER AND CONVEYOR SYSTEM
General arrangement and specific conveyor designs.
FLETCHER INTERNATIONAL
DUBBO AUSTRALIA
NEW PLATE FREZZER AND CONVEYOR SYSTEM
General arrangement and specific conveyor designs.
COMERCIAL MACLEAN
CHILE
Design, development and drawings of a Pneumatic Stainless Steel Rotary Evisceration conveyor system.
ALLIANCE GROUP DANNEVIRKE
SLAUGHTER FLOOR UPGRADE
General arrangement and specific conveyor designs.
_______________________________________________________________________________________________________
2002______________________________________________________________
MILLERS MECHANICAL – DUNEDIN (NZ)
T & R PASTORAL - MURRAY BRIDGE, SOUTH AUSTRALIA - SITE REDEVELOPMENT. On site survey. - responsible for General arrangement and layout drawings as well as specific components required – including specific development of vertical spiral carton roller conveyor.
___________________________________________________________________________________________
2001_____________________________________________________________
MILLERS MECHANICAL – DUNEDIN (NZ): (Now rebranded MILMEQ)
NARASAKI SANGYO LTD
WAKAYAMA, OGASA and NARASAKI
JAPANESE PIG PROCESSING PLANTS UPGRADES.
Responsible for site general arrangement drawings and the design development of specialised conveyors and tool and equipment sterilisers.
_______________________________________________________________________________________________
2000_____________________________________________________________
NAYLOR LOVE CONSTRUCTION - TIMARU HOSPITAL REDEVELOPMENT
Responsible for As Built drawings and updating CAD files for the Timaru hospital redevelopment.
_______________________________________________________________________________________________
1999____________________________________________________________
WORKS AND SERVICES – OTAGO UNIVERSITY - MAINTENANCE ENGINEER
Design and installation of seismic restraints for equipment at the medical and dental school and medical research facilities. Various maintenance and repair duties within same area.
_______________________________________________________________________________________________
1998____________________________________________________________
AQUAHEAT INDUSTRIES – DUNEDIN (NZ)
Installation of ventilation ducting and heat recovery system at Dunedin Casino.
_______________________________________________________________________________________________
1993 - 1997____________________________________________________
SELF EMPLOYED
MAINTENANCE ENGINEER – CENTRAL OTAGO (NZ)
Freelance maintenance engineer servicing farm machinery in Central Otago. Also freelance contract driver for farm and agricultural equipment.
_______________________________________________________________________________________________
1989 – 1993____________________________________________________
BECKERS TRANSPORT OTUREHUA - MAINTENANCE ENGINEER - FITTER WELDER
Full time fitter welder / fabricator and general engineer at the truck workshop. Obtained appropriate 4711 welding tickets.
_______________________________________________________________________________________________
1987 – 1989___________________________________________________
SELF EMPLOYED MAINTENANCE ENGINEER – CENTRAL OTAGO (NZ)
Developed a farmlet and built a house in Central Otago. Contracted as freelance Welder and general engineer.
_______________________________________________________________________________________________
1981 – 1987___________________________________________________
OWNER OPERATOR CROSBIE SHEETMETAL – OTAGO / SOUTHLAND (NZ)
Took over small business and developed “CROSBIE SHEETMETAL” sold this business and it still runs as part of PALMER MECHANICAL in Dunedin.
Undertook many industrial projects and contracts. Mainly refrigeration cladding within the meat industry and regular maintenance at Cadburys factory in Dunedin. Architectural copper and stainless work. Sub contracted Stainless Steel manufacture for Millers Mechanical.
_______________________________________________________________________________________________
1977 – 1980__________________________________________________
SOUTHLAND ENGINEERING COMPANY LTD – INVERCARGILL (NZ)
Stainless Steel fabricator then workshop manager of the fabrication shop for 2 years. Heavy engineering at NZAS and realignment of Ocean Beach Freezing slaughter floor project. Certified welding repair of Aluminium fishing vessels.
_______________________________________________________________________________________________
1972 – 1977___________________________________________________
H E GARDNER AND SONS – DUNEDIN (NZ)
Completed time as apprentice Sheetmetal worker – became specialised in Stainless Steel fabrication. Worked on a large number of projects with this company. Mostly heating and Ventilation and Stainless Steel fabricated components for the meat processing industry.